免费人成再在线观看网站,亚洲人成色7777在线观看不卡,国产亚洲精品国产福利,人妻少妇中文字幕久久

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.yibao68.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

在加工棚拆除前須進行技術(shù)交底!

來源:http://www.yibao68.com/   發(fā)布時間:2023-02-20

在施工過程中搭建木工加工棚一定要注意做好防護措施,施工人員一定要按照施工要求進行施工。露天的攪拌機位置,現(xiàn)場混凝土攪拌機、卷揚機棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。由于建筑使用的木工加工棚增多,使得很多廠家都可以制作木工加工棚。
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Due to the increase of woodworking sheds used in buildings, many manufacturers can make woodworking sheds.
木工加工棚在建筑工地上是保護建筑施工材料的堆放、為了防止工地物品不受雨水淋濕導(dǎo)致生銹。 木工加工棚搭設(shè)完畢后,須經(jīng)過專職員驗收合格,方可投入使用。在加工棚搭設(shè)和拆除前,須進行技術(shù)交底。
The carpentry processing shed is used to protect the stacking of construction materials on the construction site, and to prevent the rusting of site items from being soaked by rain. After the carpentry processing shed is erected, it can only be put into use after passing the acceptance of the full-time safety officer. Before the erection and removal of the processing shed, safety technical disclosure must be carried out.
高處作業(yè)人員須經(jīng)過技術(shù)培訓(xùn)及考試合格,持證上崗。木工加工棚采用的鋼管、扣件等材料須符合技術(shù)規(guī)范及有關(guān)標(biāo)準(zhǔn)要求。搭設(shè)和拆除水平木工加工棚時,操作工人的“三寶”須齊備,且應(yīng)正確使用。
High-altitude operators must receive professional technical training and pass the professional examination, and work with certificates. The steel pipes, fasteners and other materials used in the woodworking shed must meet the requirements of safety technical specifications and relevant standards. When erecting and dismantling the horizontal woodworking processing shed, the operators' "three treasures of safety" must be complete and used correctly.
木工加工棚
在木工加工棚搭拆時,應(yīng)避免上下同時作業(yè),把操作時間錯開。搭拆木工加工棚時,所有材料、工具應(yīng)堆放在建筑物外邊線以內(nèi)少2m,堆碼高度不超過1m。拆除的材料須傳遞到樓層內(nèi)并及時運走,嚴(yán)禁高空拋擲。搭拆木工加工棚時,應(yīng)在地面設(shè)置警戒區(qū),并派專人監(jiān)護。
When erecting and dismantling the woodworking shed, it is necessary to avoid working up and down at the same time and stagger the operation time. When erecting and dismantling the woodworking processing shed, all materials and tools shall be stacked at least 2m within the outer boundary of the building, and the stacking height shall not exceed 1m. The removed materials must be transferred to the floor and transported away in time. Throwing from high altitude is strictly prohibited. When erecting and dismantling the woodworking processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
木工加工棚搭拆時,要有專人指揮。管理人員要做到:眼勤、腿勤、嘴勤,對危險情況要積極采取有效防護措施,確保人員。雨天、大風(fēng)天氣,暫停木工加工棚搭拆施工,并應(yīng)檢查維護木工加工棚的。
When erecting and dismantling the woodworking shed, a special person shall be assigned to command. The management personnel shall be diligent in eyes, legs and mouth, and actively take effective safety protection measures for dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and dismantling of woodworking processing shed shall be suspended, and the safety of woodworking processing shed shall be checked and maintained.
在施工過程中搭建木工加工棚一定要注意做好防護措施,施工人員一定要按照施工要求進行施工。露天的攪拌機位置,現(xiàn)場混凝土攪拌機、卷揚機棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。您有需求就來我們網(wǎng)站http://www.yibao68.com咨詢吧!
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Come to our website if you need http://www.yibao68.com Ask!

欧美精品18VIDEOSEX性欧美| 中文字幕一本一道在钱| 久久久久久国产精品免费免费男同| 一区二区三区中文字幕| 欧美日韩一卡2卡3卡4卡无卡| 少妇人妻88久久中文字幕| 欧美一区二区三区美人| 免费无码AV片在线观看网址| 亚洲欧美日韩国产综合V| 日韩乱码中文在线| 日韩在线观看一区二区不卡视频| 中国帅男同志CHINAGAY| 国产精品嘘嘘麻豆久久| 国产野战无套av毛片| 无人区码卡二卡乱码中国字幕| 国产亚洲精品日韩综合网| 又大又粗又长的高潮视频| 亚洲国产欧美在线| 色噜噜狠狠色综合日日| A大片免费久久精品| 韩漫画免费网站在线观看| 九九全国免费视频| 午夜亚洲AV永久无码精品| 99精品高清视频一区二区| 99久免费精品视频在线观看2| 亚洲精品国产首次亮相| 中文字幕欧美亚洲国产| 人妻激情偷乱视频一区二区三区| 日韩视频,中文字幕| 日啪人妻中文字幕| 欧美日韩精品一区二区三区视频在线| 九一福利在线观看视频一区二区| 国产精品一区高清在线观看| 国产精品久久久久久五月尺| 国产亚洲一区二区三区啪| 韩国理论做爰片免费看| 99久久国产综合色| 国产免费人成视频在线观看| 50岁退休熟女露脸高潮| 日本一区日本一区二区三区| 久久久久久臀欲欧美日韩|