濟(jì)南工地鋼筋加工棚如何搭設(shè)?

來(lái)源:http://www.yibao68.com/   發(fā)布時(shí)間:2022-03-16

1、木工加工棚工地鋼筋加工棚搭設(shè)規(guī)范:

1. Specification for erection of reinforcement processing shed on site:
鋼筋加工棚是施工現(xiàn)場(chǎng)內(nèi)對(duì)鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個(gè)場(chǎng)地。鋼筋加工棚的長(zhǎng)和寬,一般會(huì)根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實(shí)際情況,自行設(shè)計(jì)長(zhǎng)與寬尺寸。鋼筋加工棚工作臺(tái)的布置也要合理,根據(jù)真實(shí)鋼筋加工流程來(lái),還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場(chǎng)地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時(shí),應(yīng)有地橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and other types. The length and width dimensions can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed should also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing and after processing, the ground of the reinforcement processing shed should be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there should be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地鋼筋加工棚搭建細(xì)節(jié):
2. Construction details of reinforcement processing shed on site:
埃歐哲鋼筋加工棚采用國(guó)際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場(chǎng)利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗(yàn)鋼結(jié)構(gòu)強(qiáng)度是否符合設(shè)計(jì)要求,在欄桿上鉤掛標(biāo)語(yǔ)橫幅,整個(gè)鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計(jì)。全拼裝式,快速組裝,拆卸簡(jiǎn)單,方便運(yùn)輸,型材及配件規(guī)格可按需求來(lái)定制。同時(shí)地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, a number of steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings, and the construction of the whole reinforcement processing shed is completed with standardized design. Fully assembled, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
3、工地鋼筋加工棚需注意事項(xiàng):
3. Precautions for reinforcement processing shed on site:
1.一般情況下,鋼筋加工棚都在塔吊的吊運(yùn)范圍內(nèi),否則鋼筋吊動(dòng)不方便,同時(shí)必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實(shí)際情況來(lái)定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed should be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo flakes, with a spacing of 500 mm between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語(yǔ)的橫幅,圖牌的尺寸為:寬×高=2000mm×1000mm,橫幅寬度宜為1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at the eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the width of the banner should be 1m.
4.加工車間地面需硬化,宜選用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工車間地面需硬化,宜選用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩
7. In the south, in case of typhoon, windproof measures shall be taken, and wind ropes can be set

国产精品电影久久| 韩国理论午夜电影| 亚洲自偷自拍另类12| 精品香蕉99久久久久成人网站| 四虎免费影院1515WWW| 1a级毛片免费观看| 美丽的小蜜桃| 国产成人亚洲综合网色欲网久下载| 亚洲A∨国产AV综合AV网站| 哥布林洞窟第一季未增删免费观看| 亚洲精品亚洲人成在线| 18禁真人抽搐一进一出在线| 日本三级欧美三级人妇视频黑白配| 伦理电影 百度影音| 久久综合精品国产一区二区三区| 精品一区二区三区无码免费视频| 亚洲激情久久| 成人色网在线观看| 亚洲日韩国产成网在线观看| 精品欧美日韩国产| 交换娇妻系列38部分阅读| 亚洲男人天堂久久久久久久| 国产在线视频www色| 欧美牲交a欧美牲交aⅴ电影| 97人人添人澡人人爽超碰| 免费的情色网站| 日本黄片在线免费观看| 美女裸体18禁免费网站| 中文字幕无码视频手机免费看| 国产亚洲AV片在线观看播放| 中文字幕不卡一区每日更新| 亚洲天堂av一区二区| 午夜理论片在线观看免费| 欧美av电影在线播放| 好男人社区在线观看免费视频| 国产l精品国产亚洲区久久| 欧美高清在线视频一区二区| 亚洲黄色一级电影| 很黄很黄叫声床戏免费视频| 亚洲欧洲日本精品专线| 午夜视频免费二分钟试看|